Back
Projects list Combined highway and railway road from Adler to Alpica Service alpine resortThe combined highway/railway road from Adler to Alpica Service alpine resort is one of the largest projects having been implemented recently on the Russian soil.
This combined road is an integral part of the 2014 Olympic transport network that links main sea, railway and air transport terminals in the city of Adler with Olympic venues and nearby alpine resorts. This road is designed to serve athletes and gests of the 2014 Olympic games and tourists and vacationers in general.
With regard to road layout conditions, passenger safety and comfort, and concentration of infrastructure facilities this road has no parallels in the country’s road construction history.
The railway track spans 48.3 km, including 11.2 km of bridges, and 10.4 km of 6 tunnels.
The highway spans 45.6 km, including 14.3 km of bridges, and 7.6 km of 3 tunnels.
The road project includes construction of permanent and temporary facilities.
Permanent facilities include highway and railway infrastructure, transfer terminals and stations, railway traction substations, repair facilities and operation units. Temporary facilities include bridges, construction camps, storage and supply facilities, asphalt and concrete plants, and construction waste sites. 2007. Development of the preliminary environmental impact assessment section (EIA) in the Justification of Investment book for the Adler-Vesyoloe-Krasnaya Polyana railway construction project.
The EIA scope of work included • environment baseline-state assessment, • forecast and assessment of project’s impact on the environment, • development of necessary environmental protection measures. The IAE was based on
• deliverables of engineering and environmental surveys conducted by specialized leading Russian companies in previous years. • results of perennial studies of highly knowledgeable biologists and environmental engineers of the Sochi national park and other research and design institutions, • historic records, library and archive materials. 2008. Environmental engineering surveys of the Adler Roza Khutor highway.
2009. Environmental engineering surveys for the project “Combined highway and railway road from Adler to Alpica Service alpine resort.” These surveys were to reveal the state of the components of environment that are needed
• to develop the sections “Environmental protection measures” in the documentation for the projects “Construction of the combined highway and railway road from Adler to the lower station of Roza Khutor alpine resort” and “Combined highway and railway road from Adler to the lower station of Alpica Service alpine resort” • to obtain baseline data necessary for the development of environmental requirements for the construction management plan. The environmental engineering surveys have been carried out by the Environmental Centre IFPA with the expert support of
• biologists of Moscow State University • the Black Sea branch of KubanGeologia geological company, • the Specialized centre for Hydrometeorology and Environmental Monitoring of the Black Sea and Azov Sea, • the Sochi branch of the Krasnodar Territory Hygiene and Epidemiology Centre, and • Ekodorservis environmental road service company. The environmental engineering studies included assessment of the state of surface runoff, subsurface waters, soil, vegetation, wildlife, aquatic biota, and atmospheric air (environmental pollution and noise characteristics).
2008-2010. Development of the environmental management sections, environmental impact assessment sections including, for the project “Combined highway and railway road from Adler to Alpica Service alpine resort” and updating of these materials.
Rostekhnadzor has approved the positive conclusion granted to the whole project by the state construction project environmental expert review agency (Conclusion no. 1050 of 23 December 2009). 2009-2010. The projects of reclamation of the territories used by the construction project “Combined highway and railway road from Adler to Alpica Service alpine resort” (general design stage).
2010-2013. The projects of reclamation of construction disturbed lands prepared as an integral part of the specification documents for the project “Combined highway and railway road from Adler to Alpica Service alpine resort”. |