• main page
  • search
  • put us a question
  • map
  • print version


Project archive 2013-2014

SERVICES PROVIDED:
 
 
I. INTEGRATED ENVIRONMENTAL STUDIES, AND DEVELOPMENT OF EIA AND  ENVIRONMENTAL PROTECTION MEASURES (EPMB) OF CONSTRUCTION PROJECT DOCUMENTATION FOR DIFFERENT INDUSTRIES
 
Disturbed Soil Remediation Project for Facility «Combined (highway/railway) Adler - Alpine Alpica Service Resort». The Supplementary agreement on Stages 1-28., 2013
Customer – OAO «SIBGIPROTRANSPUT» - Branch OAO«ROSZHELDORPROEKT»

Adjustment of Section Environmental protection Measures (EPMB) and Disturbed Soil Remediation Project for Facility «Combined (highway/railway) Adler - Alpine Alpica Service Resort» with the solid construction of a second track on the Sochi - Adler - Fun (design and survey works, construction). Stage 1-28., 2013-2014
Customer – OAO «SIBGIPROTRANS»
 
Adjustment of Section Environmental protection Measures (EPMB) for the object "construction of the stopping points "Upper Imereti resort" by the title "Combined (road and rail) road from Adler to the Mountain resort "Alpika-Service" (design and survey works, construction). Stage 4., 2013
Customer – OOO UK «TRANSYJSTROI»
 
Development of a set of initial permissive documentation by the title "Combined (road and rail) road from Adler to the Mountain resort "Alpika-Service" (design and survey works, construction):
The adjustment of the boundaries of the second zone district mountain-sanitary protection of Sochi (2007. 2011) at site No. 2 (Krasnaya Polyana) to host the Olympic facilities in the area of the slopes of Pseasho and railway tracks;
Rationale for selection of sanitary protection zones (SPZ) of water intakes for drinking water supply in the valley of the Mzymta river. Stages 18-22,26., 2013
Customer – JSC «RUSSIAN RAILWAES»
 
Developing the EIA as part of the project documentation for the project «Stationary pop-up boom of the underwater crossing of the trunk pipeline Ryazan-Moscow over the river Moscow», 2013-2014
 
Development of Section Environmental protection Measures (EPMB) for the project "Construction of a Harbor Parking transshipment of oil cargo complex in the Bay Devkin backwater (Barenzovo sea)", 2013
 
Development of EIA as part of design and survey works:
The first place of the ESPO pipeline system - Spetsmornefteport Kozmino. Offshore facilities. Offshore structures. Mooring facilities. Corridor communications from the depot to the site of coastal structures. Approaching the dam reconstruction, 2013-2014
Development of design documentation, the FEED documentation and technical specification for object "Shipping terminal, cargo terminal and port infrastructure of an LNG plant near Vladivostok", 2014
Customer – OAO «SOIUZMORNIIPROEKT»
 
Developing the EIA as part of the project documentation for the project «Stationary pop-up boom of the underwater crossing of the trunk pipeline Ryazan-Moscow over the river Moscow», 2013-2014
Development of Section Environmental protection Measures (EPMB) for the project "Construction of a Harbor Parking transshipment of oil cargo complex in the Bay Devkin backwater (Barenzovo sea)", 2013
 
Development of EIA as part of design and survey works:
The first place of the ESPO pipeline system - Spetsmornefteport Kozmino. Offshore facilities. Offshore structures. Mooring facilities. Corridor communications from the depot to the site of coastal structures. Approaching the dam reconstruction, 2013-2014
 
Development of design documentation, the FEED documentation and technical specification for object "Shipping terminal, cargo terminal and port infrastructure of an LNG plant near Vladivostok", 2014
Customer – OAO «SOIUZMORNIIPROEKT»
 
Development of Section Environmental protection Measures (EPMB) of the object: "Arctic terminal round shipment of oil Novoportovskoye field" (the Ob Bay, Kara sea, the Cape of Stone), 2014
Customer – OOO «STROYTRANSGAZ-M»
 
Development and coordination of environmental design documentation sections of the "FIFA world Cup Stadium in the city of Kaliningrad".
Evaluation of the project and participation in the certification for compliance with minimum 3C level BREEAM., 2013-2014
Customer – OOO «NPO «MOSTOVIK»
 
Development of EIA as part of the General plan of the city of Krasnoyarsk., 2014
Customer - OOO "GIPROGOR"
 
Execution of design and survey works and the provision of services under the author's supervision at the facilities of OAO AK Transneft for reconstruction of objects: Reloading complex "Sheskharis" - Platform "Pear" and also the Upper and lower landings of the complex "Sheskharis".
Customer - OAO «GIPROTRUBOPROVOD». 
 
II. DEVELOPMENT OF DRAFT REGULATIONS OF MAXIMUM PERMISSIBLE EMISSIONS (MPE), MAXIMUM PERMISSIBLE DISCHARGE (MPD), DISPOSAL OF WASTE, JUSTIFICATION OF USE OF NATURAL RESOURCES, MATHEMATICAL MODELLING
 
Calculations of planned payments for contamination of environment for the administrative building company «AK «Transneft» and getting approval of these estimates from the regulatory authorities. 2013
Customer - JSC «AK «TRANSNEFT».
  
III. ENVIRONMENTAL CONSULTING
 
Environmental consulting services for the CPC Facility Extension, 2013
Customer – SHEVRON-NEFTEGAZ-INK (Russian branch)
 
Providing consulting services in the field of environmental legislation, 2013-2015
Customer – ANTEA GROUP (State Minnesota, USA), ANTEA GROUP (France)
 
Assessment and monitoring the certification process for «Olympic Park» Railway Station " by the title "Combined (road and rail) road from Adler to the Mountain resort "Alpika-Service". Assessment of the construction of the railway station "Imeretinskaya" to meet the PASS level of the individual to the international standard BRIM of BESPOKE (BREEAM BESPOKE). 2014
Customer – OAO «SIBGIPROTRANSPUT» - Branch OAO«ROSZHELDORPROEKT».
 
IV. SITE AND ENVIRONMENTAL SURVEYING
 
Site and environmental surveying by the title: "Construction of fuel storage (TTS) at the station Imeretinskaya". The additional amount of Site and environmental surveying. The development of the project SPZ., 2013
Site and environmental surveying by the title: "Construction of the maintenance shop of locomotives at the station Imeretinskaya". Additional work within Site and environmental surveying. The development of the project SPZ., 2013
Customer – OAO «GIPROTIAZHMASH»

Development of report on materials of environmental surveys for the project "Construction of a Harbor Parking transshipment of oil cargo complex in the Bay Devkin backwater (Barenzovo sea)", 2013-2014
Customer – OAO «SOIUZMORNIIPROEKT»
 
Site and environmental surveying of the object: "The Arctic terminal round shipment of oil Novoportovskoye field" (the Ob Bay, Kara sea, the Cape of Stone), 2014
Customer – OOO «STROYTRANSGAZ-M»
 
Diagnosis of soil contamination and groundwater on-site for three sites of the enterprise JSC "Contactor" in Ulyanovsk (Stage 1,2). The development of a Programme of ecological surveys., 2014
Customer - JSC "CONTACTOR" 
 
V. ENVIRONMENTAL AUDIT
 
An environmental audit (phase 2) area located in the Moscow region for the expansion of enterprises MICHELIN GROUP. 2013-2014
Customer  - HANS PIKEL CONSULTING Envirotec , (France)
 
Environmental audit of AvtoVAZ. Town of Togliatti, Samara region and the city of Izhevsk, Republic of Udmurtia, 2013-2014
Environmental audit of a piece of land of LLC «Orggsintez». Town of Novomoskovsk, Tula region, 2013
Environmental assessment (phase 1) status of the two areas for Coca-Cola in Moscow and Novosibirsk, 2013-2014
Customer – ANTEA GROUP (State Minnesota, USA), ANTEA GROUP (France) 

Vernadsky Avenue 94, Building 1, of.6,7,9,
Moscow, Russia, 119571
tel. +7 (499) 503-93-93, 503-93-83, +7 (495) 646-31-01
fax +7 (499) 503-93-93, 503-93-83,
e-mail ec@ecifpa.ru
© 2024 «Environmental Centre IFPA»
Made by iCom