Project archive 2009-2010SERVICES PROVIDED:
I. INTEGRATED ENVIRONMENTAL STUDIES, AND DEVELOPMENT OF EIA AND EP VOLUMES OF CONSTRUCTION PROJECT DOCUMENTATION FOR DIFFERENT INDUSTRIES
Expert reviewing of site and environmental survey deliverables in the volume Environmental protection measures including environmental impact assessment for BPS-2 facility from Ust-Luga to the Kirishi refinery. Customer – Transgeoproyekt Design Institute, 2009 Expert reviewing of engineering and environmental survey deliverables for development of EIA volume for the feasibility analysis of the South Stream gas pipeline construction project ". Customer – Transgeoproyekt Design Institute, 2009 Development of environmental protection measures in the port of Novorossiysk. Customer – Promterproekt company, 2009 Environmental investigations for the Adler Roza Khutor joint rail/motor road project. Customer – Mosgiprotrans Road Design Institute, 2009 Environmental protection measures, reclamation of territories and land plots for the construction of Adler-Roza Khutor joint rail/motor road. Customer – USK Most Co., 2009
Environmental protection measures, reclamation of territories and land plots for the construction of Adler Alpica-Service joint rail/motor road. Customer – USK Most Co., 2009 Development of design documentation and environmental surveying for expansion of the CPC oil pipeline system. Customer – NIPI Gazpererabotka, 2008-2009 Environmental protection measures for the project Adler Alpica-Service joint rail/motor road (design and surveying works, construction). Customer – Sibgiprotrans, 2009
II. DEVELOPMENT OF DRAFT REGULATIONS OF MAXIMUM PERMISSIBLE EMISSIONS (MPE), MAXIMUM PERMISSIBLE DISCHARGE (MPD), DISPOSAL OF WASTE, JUSTIFICATION OF USE OF NATURAL RESOURCES, MATHEMATICAL MODELLING
Calculations of planned payments for contamination of environment and getting approval of these estimates from the regulatory authorities. Customer – Transneft oil transport company, 2009-2010 Development and approval of Draft waste disposal allowance request sections for a Transneft building. Approval of the sections for MPE of emergency power supply of the Transneft building Customer – Giprotruboprovod Pipeline Design Institute, 2008-2009 Development of MPE and calculation of physical factors for TogliattiAzot transshipment terminals on the Black Sea. Development of the draft “Joined sanitary protection zone of TogliattiAzot and Tamanneftegaz facilities” and “Risk assessment for population health.” Customer – TogliattiAzot company, 2009 Development of MPE and calculation of physical factors for the Taman LHCG tank park and oil terminal . Customer - Tamanneftegaz, 2009
III. ENVIRONMENTAL CONSULTING Consultancy services and in the area of environmental science and conduct of environmental audit . Customer - Harress Pikkel Cunsultant AG, 2009 - 2010 Consultancy services and preparation of R&D deliverables in the field of environmental science. Customer – Delta Environmental Consulting, 2009-2012
IV. SITE AND ENVIRONMENTAL SURVEYING
Site and environmental surveys for the project “Joint motor/rail road from Adler to Alpica-Service mountain resort.” Phase 1. “Construction of second track on the Adler-Imereti resort section”. Customer – Mostovik Research and Production Amalgamation, 2009
V. ENVIRONMENTAL AUDIT Environmental audit of a Vilarus facility in Moscow Region. Customer - Harress Pikkel Cunsultant AG, 2009 Environmental audit for two facilities of Coca-Cola Company (in Moscow and Novosibirsk). Customer – Delta Environmental Consulting, 2009
|