• main page
  • search
  • put us a question
  • map
  • print version


Project archive 2009-2010

SERVICES PROVIDED:
 
 

I. INTEGRATED ENVIRONMENTAL STUDIES, AND DEVELOPMENT OF EIA AND EP VOLUMES OF CONSTRUCTION PROJECT DOCUMENTATION FOR DIFFERENT INDUSTRIES

Expert reviewing of site and environmental survey deliverables in the volume Environmental protection measures including environmental impact assessment for BPS-2 facility from Ust-Luga to the Kirishi refinery.
Customer – Transgeoproyekt Design Institute, 2009
 
Expert reviewing of engineering and environmental survey deliverables for development of EIA volume for the feasibility analysis of the South Stream gas pipeline construction project  ".
Customer – Transgeoproyekt Design Institute, 2009
 
Development of environmental protection measures in the port of Novorossiysk.
Customer – Promterproekt company, 2009
 
Environmental investigations for the Adler  Roza Khutor joint rail/motor road project.
Customer – Mosgiprotrans Road Design Institute, 2009
 
Environmental protection measures, reclamation of territories and land plots for the construction of Adler-Roza Khutor joint rail/motor road.
Customer – USK Most Co., 2009

Environmental protection measures, reclamation of territories and land plots for the construction of Adler  Alpica-Service joint rail/motor road.
Customer – USK Most Co., 2009
 
Development of design documentation and environmental surveying for expansion of the CPC oil pipeline system.
Customer – NIPI Gazpererabotka, 2008-2009
 
Environmental protection measures for the project Adler  Alpica-Service joint rail/motor road (design and surveying works, construction).
Customer – Sibgiprotrans, 2009
 
II.  DEVELOPMENT OF DRAFT REGULATIONS OF MAXIMUM PERMISSIBLE EMISSIONS (MPE), MAXIMUM PERMISSIBLE DISCHARGE (MPD), DISPOSAL OF WASTE, JUSTIFICATION OF USE OF NATURAL RESOURCES, MATHEMATICAL MODELLING
 
Calculations of planned payments for contamination of environment and getting approval of these estimates from the regulatory authorities.
Customer – Transneft oil transport company, 2009-2010
 
Development and approval of Draft waste disposal allowance request sections for a Transneft building.
Approval of the sections for MPE of emergency power supply of the Transneft building
Customer – Giprotruboprovod Pipeline Design Institute, 2008-2009
 
Development of MPE and calculation of physical factors for TogliattiAzot  transshipment  terminals  on the Black Sea.
Development of the draft “Joined sanitary protection zone of TogliattiAzot and Tamanneftegaz facilities” and “Risk assessment for population health.”
Customer – TogliattiAzot company, 2009
 
Development of MPE and calculation of physical factors for the Taman LHCG tank park and oil terminal  .
Customer - Tamanneftegaz, 2009

III.  ENVIRONMENTAL CONSULTING
 
Consultancy services and in the area of environmental science and conduct of environmental audit .
Customer -  Harress Pikkel Cunsultant AG, 2009 - 2010
 
Consultancy services and preparation of R&D deliverables in the field of environmental science.
Customer – Delta Environmental Consulting,  2009-2012
 
IV. SITE AND ENVIRONMENTAL SURVEYING
 
Site and environmental surveys for the project “Joint motor/rail road from Adler to Alpica-Service mountain resort.” Phase 1. “Construction of second track on the Adler-Imereti resort section”.
Customer – Mostovik Research and Production Amalgamation, 2009
 
V.  ENVIRONMENTAL AUDIT
 
Environmental audit of a Vilarus facility  in Moscow Region.
Customer - Harress Pikkel Cunsultant AG, 2009
 
Environmental audit for two facilities of Coca-Cola Company (in Moscow and Novosibirsk).
Customer – Delta Environmental Consulting, 2009

Vernadsky Avenue 94, Building 1, of.6,7,9,
Moscow, Russia, 119571
tel. +7 (499) 503-93-93, 503-93-83, +7 (495) 646-31-01
fax +7 (499) 503-93-93, 503-93-83,
e-mail ec@ecifpa.ru
© 2024 «Environmental Centre IFPA»
Made by iCom