• main page
  • search
  • put us a question
  • map
  • print version


Project archive 2007-2008

SERVICES PROVIDED:
 
 
I. INTEGRATED ENVIRONMENTAL STUDIES, AND DEVELOPMENT OF EIA AND EP VOLUMES OF CONSTRUCTION PROJECT DOCUMENTATION FOR DIFFERENT INDUSTRIES
 
Development of EIA and EP volumes in English for the Material offloading facility in Aniva bay.
Development of EIA and EP volumes for the sea port administration building at Aniva bay shore.
Customer – Lenmorniiproyekt Offshore Project Institute, 2007
 
Preparation of materials and preliminary EIA for justification of investment (JOI) of Altay gas pipeline.
Customer – Transgeoproyekt Institute, 2007
 
Development of EIA for the Sochi national park with allowance for existing facilities and designed Olympic venues.
Development of a system of integrated environmental monitoring of the Sochi national park.
Customer – Sochi development administration, 2007
 
Development of Environmental Volume in the Area planning Scheme for Krasnodar region.
Customer – Promterproyekt Institute , 2007
 
Development of an integrated nature protection and emergency mitigation scheme for the city of Sochi in the package of land-use planning documentation.
Customer – General Directorate of Sochi Development Program,  2007 – 2008
 
Development of EIA Volume in the justification of investments for the Adler-Veslyoloe-Krasnaya Polyana   railway construction project.
Customer – Mosgiprotrans Design Institute, 2007
 
Upgrade of Moscow Sheremetevo Airport (state of the environment, EIA of the construction of 3rd runway).
Customer – Progresstekh company, 2008
 
Development of EIA volume in the feasibility study of investments for the project of Integrated Development of Murmansk Hub.
Customer – Osobye Ekonomicheskie Zony company, 2007
 
Expert review assessment of site survey deliverables for EIA Volume in the feasibility study of investments for the construction project of Sakhalin-Khabarovsk-Vladivostok route.
Environmental stewardship section in the ESPO pipeline project documentation (oil pipeline section from the Skovorodino booster station to Kozmino).
Customer – Transgeoproekt Design Institute, 2008
 
Development of environmental protection measures in the port of Novorossiysk.
Customer – Promterproekt company, 2008-2009
 
Development of design documentation and environmental investigation for expansion of CPC oil pipeline system.
Customer – Gaspererabotka Gas Facility Design Institute, 2008
 
II.  DEVELOPMENT OF DRAFT REGULATIONS OF MAXIMUM PERMISSIBLE EMISSIONS (MPE), MAXIMUM PERMISSIBLE DISCHARGE (MPD), DISPOSAL OF WASTE, JUSTIFICATION OF USE OF NATURAL RESOURCES, MATHEMATICAL MODELLING
 
Calculations of planned payments for contamination of environment and approval of these calculations by the regulatory authorities.
Customer – Transneft oil transport company, 2007-2008
 
Development and approval of Draft waste disposal allowance request sections for a Transneft building.
Customer – Giprotruboprovod Pipeline Design Institute, 2008-2009
 
Justification of change of Sanitary protection zone of a Yu-SVL facility.
Customer – Yugkhimterminal company, 2007
 
Development and approval of draft MPE, and draft waste disposal allowance for a building of Giprotruboprovod company.
Customer  - Giprotruboprovod Pipeline Design Institute, 2007
 
Expansion of the ESPO pipeline system. Noise impact assessment for Administrative and living quarters of Vostok-Nefteprovod Co. in the city of Bratsk.
Customer - Giprotruboprovod Pipeline Design Institute, 2007
 
Development of MPD allowances for FSO Okha operating on the Piltun-Astokh field.
Customer – Sakhalin Energy Investment Company Ltd., 2008
 
III.  ENVIRONMENTAL CONSULTING
 
Report “Environmental aspects of Sakhalin 2 development for different facilities”.
Customer - Sakhalin Energy Investment Company, 2007
 
Consultancy services and preparation of R&D deliverables in the area of environmental science (translation of audit materials).
Customer -  HPC Harress Pikkel, 2007
 
Consultancy services and preparation of R&D deliverables in the field of environmental science.
Customer – Delta Environmental,  2006-2008
 
Compilation of a list of legal acts (federal regulations) of 2007.
Customer – Delta Environmental, 2007
 
Consultancy services and preparation of R&D deliverables in the field of environmental science.
Customer – Delta Siemens,  2007
 
Development of special requirements for town development used territories.
Customer – Giprogor Town Planning Institute, 2007- 2008
 
IV. SITE AND ENVIRONMENTAL SURVEYING
 
Environmental investigations of Adler-Roza Khutor motor road.
Customer – Mosgiprotrans Road Design Institute, 2008
 
Development of design documentation and environmental surveying for expansion of the CPC pipeline system.
Customer – NIPI Gazpererabotka, 2008
 
V. ENVIRONMENTAL AUDIT
 
Environmental audit on a site in the city of Nizhnevartovsk.
Customer – Delta Environmental,  2007
 
Environmental audit on Sheremetevo construction site. Phase 2.
Customer – Delta Siemens,  2007
 
Environmental audit of a process site on the Baltic Petroleum land plot. Geochemical investigation of territory.
Customer – Baltic Petroleum, 2008

Vernadsky Avenue 94, Building 1, of.6,7,9,
Moscow, Russia, 119571
tel. +7 (499) 503-93-93, 503-93-83, +7 (495) 646-31-01
fax +7 (499) 503-93-93, 503-93-83,
e-mail ec@ecifpa.ru
© 2024 «Environmental Centre IFPA»
Made by iCom