Project archive 2005-2006

SERVICES PROVIDED:

I. INTEGRATED ENVIRONMENTAL STUDIES, EIA’S, ENVIRONMENTAL PROTECTION SECTIONS / BOOKS / VOLUMES IN PROJECTS IN DIFFERENT INDUSTRIES

II. DEVELOPMENT OF MPE, MPD AND WASTE DISPOSAL PROJECTS / REPORTS; SUBSTANTIATIONS OF THE LIMITS OF NATURAL RESOURCES USAGE; MATHEMATICAL MODELING

III. ENVIRONMENTAL CONSULTING

IV. EVALUATION OF ENVIRONMENTAL DAMAGES (INCLUDING FISHERY DAMAGES)

V. ENVIRONMENTAL SURVEYS

VI. DUE DILIGENCE / ENVIRONMENTAL AUDITS

I. INTEGRATED ENVIRONMENTAL STUDIES, EIA’S, ENVIRONMENTAL PROTECTION SECTIONS / BOOKS / VOLUMES IN PROJECTS IN DIFFERENT INDUSTRIES

SAKHALIN-2 PROJECT PHASE 2. FULL DEVELOPMENT OF PILTUN-ASTOKHSKOYE AND LUNSKOYE LICENSE FIELDS
Client – Sakhalin Energy Investment Company, Ltd., 2005, 2006.

A comparative review of pipeline route alternatives and development of the detailed design project for the  pipeline route selected.

Developing the detailed design project for pipeline route alternative option 1 for the zone from the platforms to the coast.

Developing the Environmental Protection section for the project of Molikpaq platofrm tie-in with the onshore facilities.

Updating the EIA and the damage calculation to reflect the results of modeling the potential dispersion of particles in the sea during the construction of PA-B and LUN-A platforms.

Putting together a section summarizing the results of the completed evaluation and calculation for inclusion into a broader document titled ‘Environmental Substantiation of Optimizing the Detailed Design Technical Solutions Associated with the Contruction of PA-B and LUN-A Platforms’.

Developing the EIA and the EPS (Environmental Protection section) for the project ‘Further Detailed Report for the LNG/OET Effluent Treatment Facility and the Deepwater Effluent Outlet in Aniva Bay’.

The report ‘The Environmental Aspects of the Sakhalin-2 Development by the Various Project Assets / Facilities’.

SAKHALIN-2 PROJECT PHASE 2.
Client – Starstroi, Ltd., 2005, 2006.

Construction of the project pipelines from OPF facility to KP93, approvals.

Developing a database for the regular environmental monitoring for all the onshore facilities of Sakhalin-2 project phase 2.

SAKHALIN-2 PROJECT PHASE 2. PROTECTION FACILITY IN ANIVA BAY NEAR PRIGORODNOYE
Client – LenMor-NII- Proekt., 2005.

Developing the EIA and the Environmental Protection section.

SAKHALIN-2 PROJECT PHASE 2. MATERIALS OFFLOADING FACILITY (MOF) AT ANIVA BAY
Client – LenMor-NII- Proekt., 2006.

Developing the EIA and the Environmental Protection section in English.

SAKHALIN-2 PROJECT PHASE 2. PORT ADMINISTRATION BUILDING
Client – LenMor-NII- Proekt., 2006.

Developing the EIA and the Environmental Protection section for the building for port administration located at the coast of the Bay of Aniva.

SAKHALIN-1 PROJECT
Client – Exxon Neftegas Limited, 2005.

Preparing an environmental monitoring program for emergency situations.

Assisting ENL in preparing the response to the regulators’ comments.

Accommodating the federal and regional regulators’ comments to Sakhalin-1 Environmental Monitoring program.

LOMONOSOV CITY COMMERCIAL SEA POR
TClient – ZAO Yantar, 2005.

Developing the EPS as part of the project’s TEOC deliverable, providing consulting / helpdesk services.

SAKHALIN-1 PROJECT. CHAYVO BAY TEMPORARY MOORING FACILITY CONSTRUCTION AND OPERATION PROJECT
Client – OAO DNIIMF (FEMRI), 2005, 2006.

Developing the Environmental Protection section as part of the TEOC.

Reviewing alternative design options.

EASTERN SIBERIA – PACIFIC COAST (ESPC/VSTO) OIL PIPELINE
Client – OOO RosInCor, 2005, 2006.

Developing Environmental Protection Section working chapters in the TEOC deliverable of the project of Tayshet-Skovorodino pipeline section and Perevoznaya oil terminal (phase 1).§ Progressing the deliverable through reviews.

EASTERN SIBERIA – PACIFIC COAST (ESPC/VSTO) OIL PIPELINE.THE EXPANSION PROJECT
Client – OOO TsNIIP TransGeoProekt, 2006.

Developing the EIA.

GAS TRANSPORTATION FROM BOVANENKOVSKOYE FIELD ON YAMAL PENINSULA TO THE UNIFIED GAS PIPELINE SYSTEM (THE YAMAL – CENTER SYSTEM)
Client – OOO RosInCor, 2005.

Developing the EIA as part of the Investment Feasibility, assisting the project through the governmental environmental reviews.

HARYAGA – INDIGA OIL PIPELINE SYSTEM
Client - OOO TsNIIP TransGeoProekt, 2006.

Developing the EIA in the Investment Feasibility.

AMMONIA TRANSSHIPMENT UNIT IN TEMRYUK DISTRICT OF KRASNODAR KRAY REGION ON THE BLACK SEA
Client – OAO TogliattiAzot, 2005, 2006.

Developing the EIA.§ Developing and getting approved the program of onsite and offsite environmental monitoring for the Ammonia Unit facilities.

TUAPSE BULKER TERMINAL. (KRASNODAR KRAY REGION IN SOUTHERN RUSSIA)
Client – OOO Tuapsinsky Balkerny Terminal, 2005.

Updating the project EIA.

LIQUEFIED HYDROCARBON GASES TERMINAL CONSTRUCTION PROJECT IN SHEPSI (KRASNODAR KRAY REGION IN SOUTHERN RUSSIA)
Client – OOO SVAGAZ, 2005, 2006.

Developing the EIA.

ZHELEZNY ROG PORT PROJECT
Client – OOO PF PromTechProekt, 2005, 2006.

EIA as part of Phase 1 of the Master Plan of the southern part of Tuapse peninsula, including the site design for the industrial zone of the port ‘Zhelezny Rog’.

FEDERAL TARGET PROGRAM FOR THE DEVELOPMENT OF THE CITY OF SOCHI AS MOUNTAIN CLIMATE RESORT (2006-2014)
Client – City of Sochi Development Directorate, 2006.

Developing the EIA for Sochi National Park covering both existing and intended sites.§ Developing a system of an all-inclusive environmental monitoring of Sochi National Park.

KRASNODAR KRAY REGIONAL LAND-USE PLANNING DOCUMENT PACKAGE
Client – OOO PromTerProekt, 2006.

Developing the ‘Environmental’ section.

MURMANSK TRANSPORT UNIT INTEGRATED DEVELOPMENT
Client – OOO Osobyye Ekonomicheskiye Zony, 2006.

Developing the EIA in the Investment Feasibility.

II. DEVELOPMENT OF MPE, MPD AND WASTE DISPOSAL PROJECTS / REPORTS; SUBSTANTIATIONS OF THE LIMITS OF NATURAL RESOURCES USAGE; MATHEMATICAL MODELING

SAKHALIN-2 PROJECT PHASE 2. FULL DEVELOPMENT OF PILTUN-ASTOKHSKOYE AND LUNSKOYE LICENSE FIELDS
Client – Sakhalin Energy Investment Company, Ltd., 2005, 2006.

Preparing the application package for extension of the Water Use License.

Preparing the package of environmental documents covering the drilling phase at Lunskoye field.

Preparing the package of environmental documents covering the operations phase at Lunskoye field.

Preparing the application package for a Water Use License for the wells of Lunskoye field.

Revisiting the Maximum Permissible Emissions report that addressed the construction and reroutes of Lunskoye offshore cables and MEG pipeline.

Waste Generation and Disposal Limits project for the project LNG.

Evaluating an alternative option for disposing of the drill cuttings at LUN-A platform; posing boundary conditions to be achieved at the effluent outlet point in order to zero in on the best parameters for the filling of the bunkers.

AMMONIA TRANSSHIPMENT UNIT IN TEMRYUK DISTRICT OF KRASNODAR KRAY REGION ON THE BLACK SEA
Client – OAO TogliattiAzot, 2005, 2006.

Developing the project Waste Generation and Disposal Limits Project.§ Developing the project Maximum Permissible Emission report.

TRANSNEFT ADMINISTRATIVE BUILDING IN MOSCOW
Client – OAO AK Transneft, 2005, 2006.

Evaluating the regular environmental pollution payment (for the year and with a breakdown by year quarters) for an administrative building of Transneft and getting the evaluations through the supervising regulatory entities.

TRANSNEFT ADMINISTRATIVE BUILDING IN MOSCOW
Client – OAO GhiproTruboProvod, 2006.

Updating the design for the emergency electric power supply of Transneft administrative building for approvals.

Calculating the noise levels of the building’s diesel generator.

TRANSSHIPMENT UNIT FOR CHEMICAL PRODUCTS NEAR CHUSHKA VILLAGE IN TEMRYUK DISTRICT OF KRASNODAR KRAY REGION OF RUSSIA
Client – OOO YugHimTerminal, 2006.

Developing a project to substantiate the extent of the cumulative Sanitary Protection Zone of a three-piece industrial site, which included the transshipment unit, an oil storage  of Yu-SVL company and a terminal of SVL Terminal company.

III. ENVIRONMENTAL CONSULTING

SAKHALIN-2 PROJECT PHASE 2. FULL DEVELOPMENT OF PILTUN-ASTOKHSKOYE AND LUNSKOYE LICENSE FIELDS
Client – Sakhalin Energy Investment Company, Ltd., 2005.

Preparing the document package for the Forest Land Redesignation procedure in the districts of Nogliki and Tymovsky in Sakhalin region.

SAKHALIN-1 PROJECT
Client – Exxon Neftegas Limited, 2005, 2006.

Supporting the work on developing recommendations towards establishing categories to water bodies. The task included a review of all information that concerned water body categorization in Sakhalin-1 project zone.

Providing consulting services in the field of land planning and management in two districts of Habarovsky Kray region in the Russian Far East (districts of Ulcha, Nikolaevsk) and in Okha district on Sakhalin. This included professional consultations and checks on completeness and compliance of land allocation files for the project helicopter pads and for the project pipeline valve sites in the two districts of Habarovsky Kray and the sites of a temporary construction camp and a laydown yard in Ulcha district.

Updating Sakhalin-1 Forest Land Redesignation documents.

Consulting services under the program to study the Korean-Okhotsk population of gray whale.

Consulting services and approvals assistance during the reviews of Sakhalin-1 EIA and Environmental Protection Book.

CONSULTING SERVICES
Client – Branan Environment, 2005.

Consulting on Russian legislation on monitoring Red Book animal species.

CONSULTING SERVICES
Client – ENVIRON UK LIMITED, 2005, 2006.

Consulting services with reference to due diligence / environmental audit of sites and audit of scientific or engineering documentation.

CONSULTING SERVICES
Client – Delta Environmental Consultants, Inc., 2006.

Providing various environmental consulting services and producing various environmental documents.

Developing a Russia HSE legislation regulatory register.

CONSULTING SERVICES
Client – Delta-Simons Environmental Consultants Ltd., 2006.

CONSULTING SERVICES AND ENVIRONMENTAL REPORTS
Client – HPC HARRESS PICKEL, 2006.

IV. EVALUATION OF ENVIRONMENTAL DAMAGES (INCLUDING FISHERY DAMAGES)

SAKHALIN-2 PROJECT PHASE 2. FULL DEVELOPMENT OF PILTUN-ASTOKHSKOYE AND LUNSKOYE LICENSE FIELDS
Client – Sakhalin Energy Investment Company, Ltd., 2005, 2006.

Updating Sakhalin-2 project-wide fishery damage evaluation.

Updating the ‘working project’ for the sites at the shore of Aniva Bay, including:
   - Re-evaluation of the fishery damage associated with a simultaneous
     three-piece construction activity involving laying of oil pipelines, sewage
     piping and communication cables in one trench in Aniva Bay.
   - Calculating fishery damages associated with the effluent deepwater
     outlet (downcomer) for the system of effluent collection, treatment
     and disposal off the double site of the LNG Plant and OET
     (Oil Export Terminal).

Updating the calculation of the fishery damages by factoring in the results of modeling the dispersion of suspended matter in the sea environment during the construction of PA-B and LUN-A offshore oil platforms.

Project river Daghi fishery damage calculation.

CHAYVO BAY TEMPORARY MOORING FACILITY CONSTRUCTION AND OPERATION PROJECT
Client – OAO DNIIMF (FEMRI), 2005.

Fishery damage calculation.

EASTERN SIBERIA – PACIFIC COAST (ESPC/VSTO) OIL PIPELINE
Client – OOO RosInCor, 2005, 2006.

Reviewing the fishery damage aspects of the three alternatives for the project terminal location on the Pacific coast (the bays of Perevoznaya, Vladimir’s bay and the bay of the city of Nakhodka).

Reviewing the fishery damage aspect of the Southern Reroute of the Tayshet-Skovorodino pipeline length.

Progressing the reports through the approvals.

V. ENVIRONMENTAL SURVEYS

PORT FACILITIES IN LAVNA, MURMANSK REGION ON THE BARENTS SEA
Client – OOO LenMor-NII-Proekt, 2005.

Onshore environmental survey in the project construction zone.

VI. ENVIRONMENTAL AUDIT / DUE DILIGENCE

ENVIRONMENTAL AUDIT NEAR BUZULUK TOWN IN ORENBURG REGION IN SOUTH-EAST EUROPEAN RUSSIA
Client – Delta Environmental Consultants, Inc., 2006.

ENVIRONMENTAL AUDIT NEAR NIZHNEVARTOVSK IN WESTERN SIBERIA
Client – Delta Environmental Consultants, Inc., 2006.

ENVIRONMENTAL AUDIT AT SHEREMETYEVO LOGISTICS TERMINAL NEAR MOSCOW
Client – Delta-Simons Environmental Consultants Ltd., 2006.


Vernadsky Avenue 94, Building 1, of.6,7,9,
Moscow, Russia, 119571
tel. +7 (499) 503-93-93, 503-93-83, +7 (495) 646-31-01
fax +7 (499) 503-93-93, 503-93-83,
e-mail ec@ecifpa.ru
© 2024 «Environmental Centre IFPA»
Made by iCom